How to start the multistage pump before use?


    

① Check whether the preparations are perfect, and start the multi-stage pump after completion.

② When the speed of the multi-stage pump is stable, turn on the switches of various instruments.

③ After starting, the pointer of the ammeter will shake to the designated position, slowly open the outlet valve, and the multi-stage pump will enter normal operation. The time for closing the valve on the outlet pipeline after the centrifugal multi-stage pump is started shall not exceed 3 minutes. If the time is too long, it will cause wear of the balance plate device and damage to the mechanical seal friction pair.

④ When starting the multi-stage pump, pay attention to the reading of the current of the multi-stage pump and the vibration of the multi-stage pump. The amplitude of the vibration displacement should not exceed 0.06mm.

⑤ The lake discharge condition of the shaft seal is an important symbol of the working condition of the multi-stage pump, and the leakage amount should meet the requirements of the maintenance regulations.

Submit